City/County Inspections Department
Inspections Requirements
During the construction phase, inspections are required at the following stages:
Building Inspections
-
Footing - before any concrete is placed.
-
Foundation - before any framing is placed on foundation.
-
Slab - prior to pouring concrete (includes porch slabs)
-
Framing - after all framing is complete and before insulation is
installed (All plumbing, mechanical and electrical rough-in work must
be complete prior to framing inspection).
-
Angle - (for masonry veneer support) - after the angle is in place and
prior to loading of masonry.
-
Insulation inspection - after all insulation is complete and before wall
or ceiling material is installed.
-
Final inspection - after the building is complete
Electrical Inspections
-
Service Pole - temporary connection for construction use only.
-
Rough-In - after all wiring is in place and prior to covering with
insulation or sheetrock.
-
Final - after all wiring is complete and ready for occupancy.
Plumbing Inspections
-
Slab - prior to pouring concrete.
-
Rough-In - after all plumbing is in place and prior to covering with
insulation or sheetrock.
-
Sewer - after connection is made to City system and prior to covering
ditch.
-
Final - after all plumbing is complete.
Mechanical Inspections
-
Rough-In - after mechanical equipment is installed and prior to
covering any ducts with insulation or sheetrock.
-
Final - after all mechanical equipment is installed.