Street Name Block From To Fund Anticpated Repaving
Start Date
Acadia St 2400 W Club Bv W Ellerbee St 2010 GOBonds 57 - Poor April 2012
Acadia St 2600 W Lavender Av Greenwood Dr 2010 GOBonds 53 - Poor April 2012
Acadia St 2608 Greenwood Dr Dead End 2010 GOBonds 55 - Poor April 2012
Ader St 2900 Blair St Dearborn Dr 2010 GOBonds 52 - Poor June 2012
Alabama Ave 2200 Indian Tr Drake Av 2010 GOBonds 62 - Poor August 2011
Alcott St 1600 Colonial St Camden Av 2010 GOBonds 56 - Poor May 2012
Alexander Ave 300 Bynum St Vance St 2010 GOBonds 59 - Poor April 2011
Alexander Ave 500 Vance St Campus Dr 2010 GOBonds 59 - Poor
Alicia Ct 10 Lyle Ct Cul-de-sac 2010 GOBonds 42 - Very Poor May 2012
Alicia Ct 2 Faucette Av Lyle Ct 2010 GOBonds 46 - Very Poor May 2012
Allgood St 1000 Denver Av Craven St 2010 GOBonds 54 - Poor June 2012
Allgood St 1100 Craven St Pineland Av 2010 GOBonds 59 - Poor June 2012
Alpha Dr 800 Cul-de-sac Kaplan Ct 2010 GOBonds 73 - Fair
Alsey Pl 3200 Victor Ave Cul-de-sac 2010 GOBonds 54 - Poor April 2012
Altmont Ct 2 Stonegate Dr Cul De Sac 2010 GOBonds 62 - Poor August 2012
Ambassador Dr 3200 S Miami Bv Rolling Pines Av 2010 GOBonds 48 - Very Poor June 2012
Ambridge St 3400 Cul De Sac E Club Bv 2010 GOBonds 49 - Very Poor May 2012
American Dr 3700 Morreene Rd Linden Te 2010 GOBonds 63 - Poor August 2012
American Dr 3800 Linden Te Inwood Dr 2010 GOBonds 59 - Poor August 2012
American Dr 4000 Hillgrand Dr Westfield Dr 2010 GOBonds 61 - Poor August 2012
American Dr 4100 Westfield Dr Sunrise Pl 2010 GOBonds 65 - Poor August 2012
American Dr 4108 Sunrise Pl White Pine Dr 2010 GOBonds 57 - Poor August 2012
American Dr 4210 Barrington Pl Alamo Ct 2010 GOBonds 52 - Poor September 2012
American Dr 4300 Alamo Ct Tarawa Te 2010 GOBonds 58 - Poor September 2012
American Dr 4400 Tarawa Te Brandywine Ct 2010 GOBonds 64 - Poor September 2012

Disclaimer:This proposed list of streets to be resurfaced by the City of Durham is based on the available funding at the time the project was bid by the contractor. The rising cost of oil directly affects the price of asphalt. Substantial increases in oil prices will reduce the number of streets proposed to be resurfaced in this contract.