Street Name Block From To Fund
Ader St 2900 Blair St Dearborn Dr 2010 GOBonds 52 - Poor
Alcott St 1600 Colonial St Camden Av 2010 GOBonds 56 - Poor
Alexander Ave 500 Vance St Campus Dr 2010 GOBonds 59 - Poor
Alexander Ave 300 Bynum St Vance St 2010 GOBonds 59 - Poor
Allgood St 1000 Denver Av Craven St 2010 GOBonds 54 - Poor
Allgood St 1100 Craven St Pineland Av 2010 GOBonds 59 - Poor
Alpha Dr 800 Cul-de-sac Kaplan Ct 2010 GOBonds 73 - Fair
Altmont Ct 2 Stonegate Dr Cul De Sac 2010 GOBonds 62 - Poor
Ambassador Dr 3200 S Miami Bv Rolling Pines Av 2010 GOBonds 48 - Very Poor
Ambridge St 3400 Cul De Sac E Club Bv 2010 GOBonds 49 - Very Poor
American Dr 4108 Sunrise Pl White Pine Dr 2010 GOBonds 57 - Poor
American Dr 4000 Hillgrand Dr Westfield Dr 2010 GOBonds 61 - Poor
American Dr 4500 Valley Forge Rd Talcott Dr 2010 GOBonds 47 - Very Poor
American Dr 3700 Morreene Rd Linden Te 2010 GOBonds 63 - Poor
American Dr 4400 Tarawa Te Brandywine Ct 2010 GOBonds 64 - Poor
American Dr 4100 Westfield Dr Sunrise Pl 2010 GOBonds 65 - Poor
American Dr 4300 Alamo Ct Tarawa Te 2010 GOBonds 58 - Poor
American Dr 3800 Linden Te Inwood Dr 2010 GOBonds 59 - Poor
American Dr 4610 Annapolis Ct Governors Pl 2010 GOBonds 53 - Poor
American Dr 4210 Barrington Pl Alamo Ct 2010 GOBonds 52 - Poor
American Dr 4512 Talcott Dr Annapolis Ct 2010 GOBonds 46 - Very Poor
American Dr 4800 Chiswell Ct Cumberland Dr 2010 GOBonds 64 - Poor
American Dr 4900 Cumberland Dr Minuteman Ct 2010 GOBonds 61 - Poor
Amesbury Ln 4300 Worcester Pl Brookshire Rd 2010 GOBonds 45 - Very Poor
Amesbury Ln 4316 Brookshire Rd Swarthmore Rd 2010 GOBonds 51 - Poor

Disclaimer:This proposed list of streets to be resurfaced by the City of Durham is based on the available funding at the time the project was bid by the contractor. The rising cost of oil directly affects the price of asphalt. Substantial increases in oil prices will reduce the number of streets proposed to be resurfaced in this contract.