ST-308 Pavement Structure Design 2020

Project Manager


Clint Blackburn
Phone: 919-560-4326, ext. 30245

Project Description


This is a Request for Qualifications (RFQ) from qualified firms (Engineers) to provide pavement coring and design of the selected roads.  The selected consultant will be asked to perform the following activities for the project:

Design the pavement structures for roads – The Contractor shall collect necessary information via coring and other methods and will provide a practical solution for the full rebuilding of the pavement structure at the following locations in the City of Durham, North Carolina: 

  • South Roxboro St from East Umstead ST. to Lodge St.
  • Sprunt Ave from LaSalle St. to Hillandale Rd.
  • North LaSalle St from Hillsborough Rd. to Sprunt Ave.
  • Campus Walk from Morreene Rd to LaSalle St.
  • Ninth St from West Club Blvd to Safeway St.
  • Hood from Ramseur St. to East Main St.
  • Fulton St. from Erwin Rd. to HWY 147
  • Alexander Ave. from Duke University Rd. to Erwin Rd.
Overview of all Traffic and Pedestrian Control  –  During coring The Contractor will check traffic and pedestrian control on site to ensure compliance with current MUTCD standards. This includes ensuring proper pedestrian detours.

Project Schedule

  • Advertisement:  August 12, 2019 
  • Pre-Submittal Meeting: August 27, 2019 2-3 pm Conference Room 3A
  • Submittals are Due:  September 11, 2019 - 4pm
  • Notice to Proceed: November 2019

Project Status


The project is currently being advertised.