Catch Basin Insert Pilot Study (SP-2021-01)

The Public Works Department is working with a project team lead by Civil Consultants, Inc on a pilot study to determine the effectiveness of gross solids collection devices in stormwater catch basins in the 485-acre drainage area that drains to the site of the South Ellerbe Restoration Project. This drainage area is comprised of densely developed area, including downtown and residential areas. The major driver of this project is to implement catch basin inserts upstream of the South Ellerbe Restoration Project site in an effort to reduce the amount of maintenance needed at the project site and to determine if catch basin inserts are feasible for other locations. The pilot study drainage area is comprised of densely developed area, including downtown and residential areas.

SP-2021-01 Notice of Intent to Award (July 6, 2021)

RFQ information

RFQ Holder List

RFQ Schedule

  • Advertisement of Request for Qualifications: December 18, 2020
  • Questions due no later than January 13, 2021, 12:00 pm
  • Email request for virtual pre-submittal meeting details info: January 13, 2021, 12:00 pm
  • Pre-submittal Conference (Virtual): January 15, 2021, 2:00 PM
  • Last date and time for receipt of proposals: February 4, 2021, 5:00 PM
  • Notice to Proceed: September 1, 2021