SW-86 PW Street Maintenance Repairs 2022


PROJECT MANAGER

Mike Boyd, MSM

Phone: (984) 227- 4486 


PROJECT DESCRIPTION

This project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of asphalt pavement and repairs, sidewalk, curb and gutter (concrete & granite), (ADA) curb ramps, driveway apron and brick pavers at various locations within the City of Durham where Water & Sewer repairs were performed.
 

PROJECT SCHEDULE

  • ADVERTISEMENT: February 23, 2022
  • 2nd ADVERTISEMENT: March 29, 2022
  • PRE-BID MEETING: Wednesday, March 9, 2022 at 10:00 A.M. via ZOOM 
  • LINK FOR ZOOM MEETING:  https://us02web.zoom.us/j/86252890825?pwd=aThYYXlOdkpKcFZvNG5BM1ZtZzlDdz09
  • BID OPENING:  Friday, March 25, 2021 at 2:00 P.M. via ZOOM.  Sealed bids are to be dropped off at 101 City Hall Plaza, Durham, NC 27701 on the N. Mangum St. side pull up area by 2:00 PM; electronic password protected bids in PDF format are to be received by 2:00 PM as well. A city representative will be collecting bids between 1:00 PM and 2:00 PM.
  • 2nd BID OPENING:  April 11, 2022 at 2:00 P.M. via ZOOM. Sealed bids are to be dropped off at 101 City Hall Plaza, Durham, NC 27701 on the N. Mangum St. side pull up area by 2:00 PM; electronic password protected bids in PDF format are to be received by 2:00 PM as well. A city representative will be collecting bids between 1:00 PM and 2:00 PM.
  • LINK FOR ZOOM MEETING:  https://us02web.zoom.us/j/88930155902?pwd=Y1ZaU1I4WkVDUHpOa3ZPSE5MbWpaZz09

    Meeting ID: 889 3015 5902 
     Passcode: 2GKnmC

  • ANTICIPATED NOTICE TO PROCEED: July, 2022
  • ANTICIPATED PROJECT COMPLETION: July, 2023

PROJECT STATUS

This project provides pavement repairs that were created by a street cut for installing or repairing water/sewer utilities. Currently pavement patching and associated curb repairs are occurring in northeast Durham and moving toward east Durham.