PROJECT MANAGER
Angier Avenue & Bacon Street Designer: Kyle Monroe | Phone: 919-560-4326x30347 | Email: [email protected]
E. Pettigrew Street Designer: Jeanie James | Phone: 919-560-4326x30269 | Email: [email protected]
N. Hardee Street Designer: Jesse Jones | Phone: 919-560-4326x30222 | Email: [email protected]
PROJECT DESCRIPTION
This is a group of sidewalk projects at the following locations: Angier Avenue, Bacon Street, E. Pettigrew Street, and N. Hardee Street.
The Angier Avenue project will involve replacement of the existing sidewalk and construction of new sidewalk along the westerly side of the roadway from E. Main Street to the intersection of S. Elm Street and include curb ramp improvements and crosswalks.
The Bacon Street project will construct new sidewalk on the northwest side of the roadway from Durham Freeway to E. Pettigrew Street and connect to the improvements on E. Pettigrew Street.
The E. Pettigrew Street project will construct new sidewalk to fill in gaps along the southerly side of the roadway from Amber Street to S. Briggs Street and include curb ramps, bus stop improvements, pedestrian crossings at Driver Street & S. Plum Street.
The N. Hardee Street project will construct a new multi-use sidepath along the easterly side of the roadway from Cheek Road to Holloway Street and include curb & gutter, bus stop improvements, crosswalks, curb ramps and stormwater improvements.
PROJECT SCHEDULE
Anticipated Advertisement: TBD
Pre-Bid Meeting: TBD
Bid Opening: TBD
Anticipated Construction Start: TBD
Anticipated Construction Completion: TBD
PROJECT STATUS
This project is currently in the design phase.