Street & Thoroughfare Construction
-
City Hill Plaza (ST-243)
The design for this project, prepared by Kimley-Horn and Associates, includes new curb and gutter, new water quality devices, sidewalks with brick pavers, streetlights and landscaping at the corner of City Hall Plaza and Mangum Street.
-
2014 R. Kelly Bryant Bridge Light Repairs (ST-230)
The scope of this project is to replace the failed blue LED lights across the arches on both sides of the R. Kelly Bryant pedestrian bridge.
-
2013 Old Five Points (ST-260)
This project will construct streetscape elements at the Old Five Points intersection.
-
2014 Ninth Street Streetscape
Ninth Street streetscape improvement project is a public-private redevelopment project that seeks to address infrastructure challenges along Ninth Street.
-
2015 Speed Hump Construction (ST-275)
This project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of 12 speed humps and removal of five existing speed humps at various locations throughout Durham. The removal of speed humps includes but is not limited to required milling and patching, shoulder reconstruction and resurfacing of the street.
-
ST-254 Fayetteville-Buxton-Riddle Realignment
This project was combined with the ST-264 Fayetteville Road Widening project.
-
2013 Angier-Driver Commercial Area Streetscape
This streetscape program is designed to promote economic revitalization and improve the quality of life for residents and visitors, consider historic tradition of business enterprises and community needs, and to enhance the visual appeal of the Angier/Driver commercial corridor in Northeast Central Durham.
-
ST-257 Carver Street Extension
The city’s Public Works Department is ready to present designs of the new roadway showing the location and characteristics of the proposed improvements for Carver Street from Danube Lane to the intersection of Old Oxford Highway and Hamlin Road.
-
ST-259 NCIMED Building Basement Renovations
This project will complete the final work associated with the downtown streetscape project. The portion of sidewalk in front of the North Carolina Institute of Minority and Economic Development (NCIMED) building, also known as the Mechanics and Farmers Bank, 114 W Parrish Street, had not been completed due to underground utility conflicts. This project will resolve the conflicts and replace the existing sidewalk to complete the streetscape project on Parrish street.
-
Inspection Services for City Projects (ST-281c)
This is a Request for Qualifications (RFQ) from SLBE firms to provide Paving Inspection, and Full Depth Reclamation (FDR) Paving Inspection services for two paving projects. The firm must provide both Paving Inspector and FDR Inspector scopes of services.
-
Duke-Gregson Curb Extensions (ST-272)
This project is for the complete installation of curb extensions at six intersections. Three of the intersections will be along Duke Street and three of the intersections will be along Gregson Street.
-
Markham -Mangum-Roxboro Medians (ST-276)
This project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete removal and installation of sidewalks along portions of Ash Street, Guthrie Avenue, and Bucanan Boulevard.
-
ST-287 Pavement Condition Survey
This project conducted a pavement condition study of the streets maintained by the City of Durham.
-
RFQ for Utility Locate Services (ST-289)
PS for Inspection Services
-
2018 Unpaved Roads Study (ST-292)
This is a Request for Qualifications from engineering firms to provide professional engineering services. The selected firm will update the City’s current Unpaved Road Study, incorporating the information into a new asset management plan for these unpaved roads, and present the information to City Council.
-
RFQ Design Services-Slope Stabilization (ST-294d)
This is a Request for Qualifications (RFQ) from qualified firms (Engineers) to provide ombudsperson services for a sidewalk repair project in various locations throughout the City.
-
ST-294 Slope Stabilization
This is a construction services for a sidewalk repair project in various locations throughout the City.
-
ST-297 PWOC Asphalt Repair 2019
This project involves street repairs and resurfacing at locations through out the city.
-
ST-300C RFQ for Utility Locate Services 2019
PS for Inspection Services
-
ST-314 Pavement Condition Survey 2021
This project conducted a pavement condition study of the streets maintained by the City of Durham.
-
ST-315 Unpaved Roads Improvements 2021
This project involves rebuilding failed streets at locations through out the city.