Street Repaving
-
2010 Bond Funded Repaving Projects (ST-250-253)
On November 2, 2010, Durham voters approved the $20 million bond referendum for continued repaving of Durham streets.
-
2012 Speed Humps (ST-262)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of 12 speed humps at various site locations throughout the City of Durham.
-
2013 Speed Humps (ST-267)
This project involves the furnishing of all materials, labor, equipment,tools, etc. unless otherwise specified, for the complete installation of speed humps at various locations throughout the City of Durham.
-
2014 Speed Humps (ST-273)
This project involves the furnishing of all materials, labor, equipment,tools, etc. unless otherwise specified, for the complete installation of speed humps at various locations throughout Durham.
-
2014 Street Repairs & Repaving (ST-269)
This project involves street repairs and resurfacing at various locations throughout the City of Durham.
-
2016 Street Repair & Repaving (ST-280)
This project involves street repairs and resurfacing at locations through out the city.
-
2015 Street Repair & Repaving (ST-274)
This project involves street repairs and resurfacing at locations through out the city.
-
2012 Pavement Condition Survey (ST-263)
The project consists of a field survey of the pavement condition on all of the city streets following the ASTM Standard D6433-11 “Standard Practice for Road and Parking Lots Pavement Condition Index (PCI) Surveys,” and associated tasks as described in the “Request for Qualifications” document.
-
2017 Speed Hump Construction (ST-284)
This project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of 12 speed humps and removal of five existing speed humps at various locations throughout Durham. The removal of speed humps includes but is not limited to required milling and patching, shoulder reconstruction and resurfacing of the street.
-
2017 Ravenstone & Stonehill Estates Paving(ST-278)
This project involves street repairs and resurfacing at locations through out the city.
-
2018 Street Repairs & Repaving (ST-285)
This project involves street repairs and resurfacing at locations through out the city.
-
ST-290 Street Repair & Repaving 2019
This project involves street repairs and resurfacing at locations through out the city.
-
ST-290C Inspection Services for City Projects
This project involves inspections for street repairs and resurfacing at locations through out the city.
-
ST-298 Pavement Preservation 2019
This project will be microsurfacing, cape sealing, pavement repairs, and crack sealing of streets within Durham.
-
ST-299 Asphalt Rejuvenation 2019
This project involves applying asphalt rejuvenating oils to various streets within Durham.
-
ST-302 Street Repair & Repaving 2020
This project involves street repairs and resurfacing at locations through out the city.
-
ST-303 Pavement Preservation 2020
This project will be microsurfacing, cape sealing, pavement repairs, and crack sealing of streets within Durham.
-
ST-306 Road Rebuilding 2020
This project involves rebuilding failed streets at locations through out the city.
-
ST-308 Pavement Structure Design 2020
This project involves field investigations of existing roads, recommendations for treatment options, and inspections for street repairs and resurfacing at locations through out the city.
-
ST-310 Pavement Preservation 2021
This project will be microsurfacing, cape sealing, repaving, pavement repairs, asphalt rejuvenation and crack sealing of streets within Durham.
-
ST-311 Street Repair & Repaving 2021
This project involves street repairs and resurfacing at locations through out the city.