2021 Residential Home Elevation
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete elevation and retrofitting of the existing residential structure located at 303 Obie Drive, Durham NC, 27713. The structure is being elevated to raise the finished floor elevation above the current effective base flood elevation as part of a Hazard Mitigation Grant Program (HMGP) project, HMGP 4167-0009.
-
2021 Residential Home Demolition
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete demolition and removal of the existing residential structure and appurtenances located at 2303 Cardinal Drive, Durham NC, 27713, including parcel identification numbers 135131, 135132, 135125, and 213373. The structure and appurtenances are being removed as part of a Hazard Mitigation Grant Program (HMGP) project, HMGP 4167-0014.
-
2021 Bradford Circle Drainage Imp. (SD-2021-01)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of the stormwater drainage system along the Bradford Circle right-of-way and adjacent properties. Currently Bradford Circle is a gravel road. The gravel road surface will be replaced with asphalt and pervious concrete pavement along with the installation of sidewalk.
-
2020 Alpine Road Culvert Replacement
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete replacement of the existing storm drainage culvert where Alpine Road intersects Tributary C of Third Fork Creek.
-
2020 Buckingham Road Culvert Replacement
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete replacement of the storm drainage culvert where Buckingham Road intersects Tributary C of Third Fork Creek.
-
2020 Stormwater Infrastructure Rep. (SD-2020-02)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham.
-
2020 Odyssey Dr. Culvert Replacement (SD-2020-01)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete replacement of the existing storm drainage culvert where Odyssey Drive intersects the northern prong of Northeast Creek.
-
2020 Emergency Watershed Protection Debris Removal
The Project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the removal of debris along four reaches of streams within the City of Durham.
-
2019 HMGP Miscellaneous Services (HMGP 4167MS)
The City of Durham is seeking miscellaneous services to perform work on Hazard Mitigation Grant Program (HMGP) projects for elevation (one unit, HMGP 4167-0009-R) and acquisition (6 units, HMGP 4167-0014-R). These services include structural engineering, surveying, legal, appraisal, and asbestos inspection services. The Request for Qualifications (RFQ) is for structural engineering and surveying services. The Request for Proposals (RFP) is for legal, appraisal, and asbestos inspection services. The City expects and intends to enter into an individual contract for each service. This work is to be conducted with Federal Emergency Management Agency (FEMA) and North Carolina State funds pursuant to the grant agreements executed between the City of Durham and the State of North Carolina, Department of Public Safety, Division of Emergency Management.
-
2019 Stormwater Infrastructure Rep. (SD-2019-09)
The Stormwater Infrastructure Repairs project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs of stormwater drainage systems at various site locations throughout the City of Durham.
-
2019 MS4 Inspections (SD-2019-06 & SD-2019-07)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.
-
2019 Stormwater Infrastructure Rep. (SD-2019-02)
The Stormwater Infrastructure Repairs project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs of stormwater drainage systems at various site locations throughout the City of Durham.
-
2019 Stormwater Infrastructure Rep. (SD-2019-01)
The Stormwater Infrastructure Repairs project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs of stormwater drainage systems at various site locations throughout the City of Durham.
-
2018 HMGP Project Management (HMGP 4167)
The City of Durham is seeking planning and project management services to manage Hazard Mitigation Grant Program (HMGP) projects for elevation (one unit, HMGP 4167-0009-R) and acquisition (12 units, HMGP 4167-0014-R) activities. These activities are to be conducted with Federal Emergency Management Agency (FEMA) and North Carolina State funds pursuant to the grant agreements executed between the City of Durham and the State of North Carolina, Department of Public Safety, Division of Emergency Management.
-
2018 Carp. Flet. Rd. Culvert Stab. (SD-2018-10)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete stabilization of the Carpernter Fletcher Road culvert by means of void filling and soil stabilization using a high density polyurethane system.
-
2018 Drainage Structure Acc. & Stab. (SD-2018-09)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham. The City is soliciting bids for this project through the Small Local Business Enterprise (SLBE) program. Only firms participating in the City's SLBE program at the time of the advertisement will be considered for this work.
-
2018 SCM Renovation & Rehabilitation SWDR-2018-01
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of replacement storm drainage pipe and structures as well as grading of existing road side ditches within City of Durham rights of way.
-
2018 Stormwater Infrastructure Rep. (SD-2018-04)
The Stormwater Infrastructure Repairs and Improvements project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham.
-
2018 Trenchless Pipe Repairs (SD-2018-03)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of cured-in-place pipe (CIPP) lining of existing storm drainage pipes throughout the City of Durham.
-
2018 Culvert Replacements (SD-2018-01/SD-2018-02)
The City of Durham is seeking assistance through professional services for the design, permitting and developing of construction documents for the replacement to two existing stormwater culverts (Odyssey Drive and Alpine Road).
-
2017 Stormwater Infrastructure Rep. (SD-2017-04)
The Stormwater Infrastructure Repairs and Improvements project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham.
-
2017 MS4 Inspections (SD-2017-03)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.
-
2016 Third Fork Creek Stream Rest. (SD-2016-03)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the stream restoration of Third Fork Creek and new trail boardwalk between Martin Luther King, Jr. Parkway and Cardinal Drive.
-
2015 Trenchless Pipe Repair (SD-2015-02)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete stabilization of storm drainage pipe joints by means of void filling and soil stabilization using a polyurethane system as well as various trenchless pipe repairs throughout the city.
-
2015 East Main St. Culvert Stab. (SD-2015-01)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete stabilization of the East Main Street culvert by means of void filling and soil stabilization using a high density polyurethane system.
-
2014 MS4 Inspections (SD-2014-01)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.
-
2013 Routine Ditching & Pipe Repl. (SD-2013-04)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of replacement storm drainage pipe and structures as well as grading of existing road side ditches within City of Durham rights-of-way.
-
2013 Third Fork Creek Stream Rest. (SD-2013-03)
The services for this project will include design, permitting, development of contract documents, and construction management for restoration, enhancement, creation and preservation of stream, buffer, and wetland areas in select reaches of Third Fork Creek.
-
2013 Stormwater Infrastructure Rep. (SD-2013-01)
The Stormwater Infrastructure Repairs and Improvements project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham.
-
2013 Stormwater BMPs Maintenance (SWM 2013-01)
The Stormwater BMPs Maintenance and Rehabilitation project involves the furnishing of all materials, labor, equipment, tools, etc., unless otherwise specified, for complete maintenance and rehabilitation activities performed on various stormwater BMPs at various site locations throughout the City of Durham.
-
2013 Durham Rain Catchers (10-013)
Durham Rain Catchers reduces the impact of stormwater runoff through residential rain gardens, trees, cisterns, and downspout disconnections. This phase of Rain Catchers will install rain gardens and trees at various residential sites in an area approximately encompassed by West Main Street to the south, Watts Street to the east, Club Boulevard to the north, and Hillandale Road to the west. The project is funded in part by the Clean Water Management Trust Fund.
-
2012 Old N Durham Park Infrastructure Improvements
The 2012 Old North Durham Park Infrastructure Improvements (SD-2012-05) project involves making improvements to the field including regrading for better drainage, the addition of soil amendments, the installation of sod on the 310-foot by 170-foot athletic/multi-use field, and the installation of an irrigation system.
-
2012 MS4 Inspections (SD-2012-04)
The project includes the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete inspection of portions of the MS4 for specified site locations throughout the City of Durham. Inspections of the MS4 will include location and verification of system components, inspections to locate possible illicit discharges into the system, and general inspections of system components to document condition.
-
2012 W Knox Street Culvert Stabilization
The 2012 West Knox Street Culvert Stabilization (SD-2012-03) project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete stabilization of the W Knox Street culvert by means of void filling and soil stabilization using a high density polyurethane system.
-
2012 University Drive Culvert Replacement
The University Drive Culvert Replacement (SD-2012-02) project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of approximately 190-feet of a cast-in-place 10-foot by 5-foot reinforced concrete box culvert and approximately 160-feet of a double 5-foot by 5-foot pre-cast box culvert to convey stormwater around an existing building and underneath University Drive near the intersection of US 15/501 and University Drive.
-
2012 Drainage Repairs & Improvements (SD-2012-01)
The project involves the furnishing of all materials, labor, equipment, tools, etc. unless otherwise specified, for the complete installation of repairs, rehabilitation, and improvements of stormwater drainage systems at various site locations throughout the City of Durham.
Contact Us
-
Marvin G. Williams
Director101 City Hall Plaza, Ste. 3100
Durham, NC 27701Phone: (919) 560-4326