Reference Guide for Development

Latest Letters to Industry

  1. Letter to Industry - Jefferies Rd Lift Station 2022-11-04
  2. Letter to Industry - Cross Connection Control Ordinance Changes 2022-11-08
  3. Letter to Industry - Revision to Section 8.4 of the RGD 2022-10-31
  4. Letter to Industry - Revised Street Details (2022-02-18)
  5. Letter to Industry - Color of Truncated Domes on pedestrian ramps to be Federal Yellow
  6. Letter to Industry - Updates RGD, SUDS fee, Githens LF LTI, Celest LF LTI, and SRLS LF LTI
  7. Letter to Industry - Capital facility fees collected prior to building permit 2021-06-17
  8. Letter to Industry - Revisions to RGD Section 8.6 2020-01-09
  9. Letter to Industry - FEMA Mapping Effective Dates 2019-12-04
  10. Letter to Industry - Hydrant Meter Flushing and Valve Spacing
  11. Letter to Industry - Celeste Circle Sewer Basin
  12. Letter to Industry - Southeast Regional Lift Station Planning 2019-08-06
  13. Letter to Industry - Githens School Lift Station Basin 2019-08-06
  14. Letter to Industry - Floodplain Process Changes 2018-12-28
  15. Letter to Industry - Video Inspections 2018-12-03
  16. Letter to Industry - Floodplain Revisions issued 2018-09-25
  17. LTI (09July2018) Revisions to Reference Guide for Development
  18. 2018-06-07 Letter to Industry Street Specifications Changes
  19. Letter to Industry - Capital Facility Fees Proposed for FY 2018-2019 2018-05-01
  20. Letter to Industry - Water and Sewer Pre-Approved Products, Details, and Specifications
  21. Letter to Industry - Eno Basin Sanitary Sewer Outfall Improvements 2017-03-10
  22. Letter to Industry- Material Specification Revisions 2016-03-22
  23. Letter to Industry - New Interim Policy regarding Session Law 2015-187 H...
  24. Letter to Industry - Lick Basin Fee 2015-06-03