Skip to Main Content
Loading
Close
Loading
Durham One Call
Service request:
Click or call 919-560-1200
ADA Help
Services
Departments
Government
Connect & Engage
Español
Water Management
Search
Home
FAQs
Search
All categories
City Tree Planting Project
2 Inch Water Line Replacement Project
ABC Permits
American Tobacco District Waterline Replacement
Becoming an Eligible Training Provider
Business Recycling
City Proclamation
Community Safety Town Hall
Composting
COVID-19 FAQs
Cross Connection Control
Digital Submittals
Downtown Loop Water Main & Meter Upgrades
Durham Central Park Waterline Replacement
Durham One Call FAQs
East Main Street Waterline Replacement
Eno River Outfall Improvements
Fire Department
Fire Department - Certified Applicant FAQs
Fire Department - Entry Level Applicant FAQs
Fire Hydrant Flushing
Fire Hydrant Meter Program
Fire Services
Forever Home Durham
Lead in Drinking Water
North Elizabeth Street Waterline Replacement
Odd-Even Watering Schedule
Pay By Phone Billing
Pink Film
Planning
Police Department
Police Recruiting FAQs
Public Records Request FAQs
Reclaimed Water
Recycling
Residential Garbage
Sanitary Sewer Evaluation Study Project
Sidewalk
Solid Waste - Bulky Item Requests
Solid Waste Walltown Food Waste Collection Pilot
Southeast Pressure Zone System Improvements
Special Event Permit FAQs
Stormwater
Stormwater Utility Fee
Stormwater Utility Fee Frequently Asked Questions
Street
Toilet Rebate Program
Towing
Transportation
Vaccine FAQs: General Vaccine & Booster Questions
Vaccine FAQs: Reporting Your Vaccination or Booster Status
Vaccine FAQs: Vaccine & Booster Incentives
Water - Sewer Root Control
Water - Tiered Water Rates
Water Back Billing
Water Hammer
Water or Sewer
West Club Blvd. Corridor Utility Rehabilitation
West Main Street Waterline Replacement
Wilson to Ellerbe Creek Sanitary Sewer Outfall Relocation Project
YouthWork Internship - Business Overview
Categories
All Categories
City Tree Planting Project
2 Inch Water Line Replacement Project
ABC Permits
American Tobacco District Waterline Replacement
Becoming an Eligible Training Provider
Business Recycling
City Proclamation
Community Safety Town Hall
Composting
COVID-19 FAQs
Cross Connection Control
Digital Submittals
Downtown Loop Water Main & Meter Upgrades
Durham Central Park Waterline Replacement
Durham One Call FAQs
East Main Street Waterline Replacement
Eno River Outfall Improvements
Fire Department
Fire Department - Certified Applicant FAQs
Fire Department - Entry Level Applicant FAQs
Fire Hydrant Flushing
Fire Hydrant Meter Program
Fire Services
Forever Home Durham
Lead in Drinking Water
North Elizabeth Street Waterline Replacement
Odd-Even Watering Schedule
Pay By Phone Billing
Pink Film
Planning
Police Department
Police Recruiting FAQs
Public Records Request FAQs
Reclaimed Water
Recycling
Residential Garbage
Sanitary Sewer Evaluation Study Project
Sidewalk
Solid Waste - Bulky Item Requests
Solid Waste Walltown Food Waste Collection Pilot
Southeast Pressure Zone System Improvements
Special Event Permit FAQs
Stormwater
Stormwater Utility Fee
Stormwater Utility Fee Frequently Asked Questions
Street
Toilet Rebate Program
Towing
Transportation
Vaccine FAQs: General Vaccine & Booster Questions
Vaccine FAQs: Reporting Your Vaccination or Booster Status
Vaccine FAQs: Vaccine & Booster Incentives
Water - Sewer Root Control
Water - Tiered Water Rates
Water Back Billing
Water Hammer
Water or Sewer
West Club Blvd. Corridor Utility Rehabilitation
West Main Street Waterline Replacement
Wilson to Ellerbe Creek Sanitary Sewer Outfall Relocation Project
YouthWork Internship - Business Overview
What impacts can be expected during the construction phase of the project?
Construction will not occur on private properties. All property owners will be provided notice in advance of construction near their property. There will be pedestrian, traffic, and noise impacts during construction. The city’s contractor will be required to maintain access to residences and businesses at all times. Sound levels near active construction areas are anticipated to be between 70 and 90 decibels, with some work in high traffic areas occurring during overnight hours. Appropriate communication and signage will direct property owners, residents, and visitors to the Central Park area with regards to any impacts throughout construction.
At the completion of the project, disturbed areas along roadways and sidewalks will be repaved, and lawns will be graded and reseeded.
▼
Durham Central Park Waterline Replacement
Show All Answers
1.
Why is this work needed?
The project will replace waterlines in the project area that were installed in the 1930s and have reached the end of their useable life. The project area does not include areas that were previously rehabilitated or replaced.
2.
What impacts can be expected during the construction phase of the project?
Construction will not occur on private properties. All property owners will be provided notice in advance of construction near their property. There will be pedestrian, traffic, and noise impacts during construction. The city’s contractor will be required to maintain access to residences and businesses at all times. Sound levels near active construction areas are anticipated to be between 70 and 90 decibels, with some work in high traffic areas occurring during overnight hours. Appropriate communication and signage will direct property owners, residents, and visitors to the Central Park area with regards to any impacts throughout construction.
At the completion of the project, disturbed areas along roadways and sidewalks will be repaved, and lawns will be graded and reseeded.
3.
Will my water service be affected by the project?
During the construction phase, existing water meters in the project area will be reconnected to the newly installed waterlines. It is possible that you will be without water for a short duration (typically a few hours) while this transition takes place. Any service interruptions will be communicated with property owners in advance.
Live Edit
Close
Water Management Home
Customer Billing Services
Central Cashiering
Current Water & Sewer Rates
Deposit & Disconnection Fees
About Tiered Water Rates
Contact Customer Billing
Capital Improvement Program / Utility Engineering
Current Projects
Academy Road Waterline Extension
American Tobacco District Waterline Replacement
Celeste & Githens Lift Station Upgrades
East Durham Waterline Replacement
Eno River Sewer Replacement - Phase II
Lakewood Avenue Sewer Replacement Project
Lift Station Improvements Project - FY21B
NC-54 Waterline Replacement Project
New Hope Creek Waterline Replacement
Newman Street Water Main
North & South Durham WRF Improvements
North Durham Phase III Hydraulic Model
North Elizabeth Street Waterline Replacement
Sewer System Evaluation Survey
Sanitary Sewer Inspection and Cleaning Services
Sewer Outfall Inspection Program - South
South Durham Phase III Hydraulic Model
Southeast Farrington Sewer Improvements
Southeast Regional Lift Station and Pipeline
South Hoover Road Transmission Main
West Club Blvd. Corridor Utility Rehabilitation
West Main Street Waterline Replacement
Capital Facility Fees
Developers & Contractors
Development Services Center
Cross Connection Control
Residential & Non-Residential Customers
FAQs
Important Forms and Documents
Certified Backflow Tester Courses
Informal Internal Review
Interpretations
New Installations & Replacements
Updates and Notices
Plan Review for Building Permit Application
CCC Staff Information
Helpful Links
Report a Violation
Report a Non-Compliant Hose Bibb Irrigation System
Report an Illegal Fire Hydrant Connection
Irrigation Systems & Watering Schedules
Report an Irrigation Violation
Durham H2O 2 Go
Educational Programs & Resources
Water Conservation Poster Contest
Imagine a Day Without Water Video Challenge
Resources and Activities
Lesson Plans
Request a Presentation
Virtual Tours
Latest News
Contact Water Management
Environmental Speakers and Resources
Request Public Records
Pay Water Bill Online
City Jobs
Trash / Recycle
Schedule
small business resources
Parks &
Recreation
Zoning &
Inspections
Government Websites by
CivicPlus®
Arrow Left
Arrow Right
[]
Slideshow Left Arrow
Slideshow Right Arrow
Service request:
Click or call 919-560-1200